| At ESI we utilize state of the art molding
machines on our production floor. Our machines are subjected to a weekly
schedule of preventative maintenance to assure maximum uptime and life. We
routinely rebuild the clamp ends of our mechanical machines every year.
All of our screws and barrels are inspected annually for wear and
corrosion and replaced or repaired as necessary. Factory service
representatives calibrate each machine to a standard, annually.
After every molding run, your mold is disassembled,
cleaned and inspected. Any planned maintenance is carried out at this time
instead of waiting until the mold is needed again. We maintain a running
log on each mold in our possession noting unusual wear, any processing
problems, recurring quality problems and the like. We are never surprised
by the state of a mold because we pay attention to detail.
|

Jay M. Galvin, CEO
|